Skip to content
Customer Portals are now available!Get Started
API Documentation was updated!Learn more

Scheduled Strategies

Scheduled strategies (time-based) create work orders at fixed time intervals — regardless of whether the device has been used. They are the simplest strategy type and need no data connection.

Whenever maintenance is time-dependent rather than driven by actual load:

  • Regular cleaning
  • Safety and compliance inspections
  • Calibrations at fixed intervals
  • Lubrication or replacement of wear parts on a calendar basis

Example scenarios:

  • Monthly cleaning of all robots in a warehouse
  • Quarterly safety inspection of production equipment
  • Annual calibration of sensors

Define the schedule using:

  • Interval — How often work orders should be created (e.g. every 30 days, every 3 months)
  • Excluded dates — Specific dates when work orders should not be generated (e.g. holidays, shutdown periods)
  • Attach a suitable work template so every generated order contains the right steps.
  • Use excluded dates to avoid generating orders during shutdown periods.
  • Combine baseline scheduled maintenance with a usage-based strategy for heavily used devices.